LUXURY NEW DEVELOPMENT IN PRIVLAKA, JUST 70 METERS FROM THE SEA - SPECIAL OFFER!!! In the popular Dalmatian tourist destination of Privlaka, near Zadar, three urban villas of modern design are under construction, with a total of 26 residential units just 70 meters from the sea! Located on a spacious parcel, the villas are close to numerous sandy beaches and coves for which Privlaka is well-known. The area will also captivate you with its spectacular sunsets and stunning views of the sea and surrounding islands. Privlaka offers everything needed for a complete and relaxing stay, and thanks to its favorable geographical location, its sandy beaches are ideal for swimming as early as May. The area remains popular throughout the year as a gathering spot for kite surfers. Villa Estera - 10 Residential Units - Penthouse P8 Penthouse P8 is located on the 2nd floor of the building, with a gross area of 183.96 m² and a net area of 103.78 m². It is southeast-facing and boasts an enchanting sea view. The penthouse features a spacious open-plan kitchen, dining area, and living room (36.84 m²) with direct access to a covered terrace (12.86 m²), offering a stunning sea view! It also includes two bedrooms (13.77 m² and 10.37 m²), a hallway (5.76 m²), and a bathroom (4.29 m²). The penthouse also offers an expansive 85 m² terrace, providing a view that will leave no one indifferent. The apartment comes with an outdoor parking space and access to a shared outdoor pool. The building and apartments are being constructed with top-quality, reputable materials and will feature luxury amenities, including: Smart Inverter heating and cooling systemsUnderfloor heating in bathroomsHigh-quality interior doors with solid frames, featuring modern design and linesModern six-chamber PVC exterior joinery with triple-glazed Low-E glass from renowned European manufacturers, with electric ALU shutters and integrated mosquito screensPremium sanitary equipment from well-known EU manufacturersFirst-class parquet and ceramic tilesSmart home installation preparationSmart key-card for building entryVideo intercomElectric vehicle charging stationThermo facadeAll structural elements designed and built to the highest standards of earthquake engineering (seismic zone 9).Completion of construction and move-in are scheduled for December 2024!