A new residential complex is being built in Tar, not far from the center. Apartment C3 is located on the ground floor and consists of a hallway with an open kitchen, dining room and living room, two bedrooms, a bathroom and a garden of 44.80 m2. Electric underfloor heating throughout the apartment, air conditioning, high-quality Italian ceramics, Villeroy and Boch sanitary ware.On the ground floor of the building there is a shared bicycle storage room and two parking spaces.Construction begins in December 2024.