Čiovo, Okrug Gornji, luxurious 3-room penthouse 201 m2 in a new building with a garage parking space and one outdoor parking space in a building with an elevator. The apartment has 131 m2 of interior space plus 70 m2 in three balconies. It is located on the 4th (rear) floor, oriented north-west-south, and consists of three bedrooms (each room with its own bathroom and the largest one also has a wardrobe), hallway, 3 bathrooms, toilet, laundry room, one storage room in the basement of the building (6m2), large kitchen with dining room and large living room and three balconies (one balcony is accessed from the living room, the other two are accessed from the bedrooms). The apartment also has one garage parking space and one outdoor parking space and one storage room in the basement of the building (6m2). From the apartment and from the two southern balconies there is a beautiful panoramic view of the sea and the islands. This apartment also includes a jacuzzi and a summer kitchen on the outdoor terrace, which will have blinds and remote cameras management.It is a very high-quality building where all apartments are built according to the highest standards and equipped with exceptional quality, including air conditioners in every room, underfloor heating in the bathrooms and the living room, first-class PVC joinery with three-layer insulating glass, mosquito nets on all windows and balcony doors. , electric blinds, video surveillance and video intercom, first-class ceramics and sanitary ware (with the option to choose), excellent parquet floors in the bedrooms, top-quality hydro and thermal insulation (10 cm stone wool), anti-burglary and fire-resistant entrance doors, and even remote opening of the stairwell doors. via mobile phone.The building has 4 floors: basement (garages), basement, ground floor and two floors, two entrances with an elevator connected from the garage to the apartments. Excellent location near the sea and the beach (150m), close to all other facilities, with an excellent wide access road ( 5m).The building has a valid construction permit, so rough construction work has begun, and completion of construction is scheduled for the summer of 2025. The investor is a company, which means that the buyer does not pay real estate sales tax. Payment by construction stages.For more information and sightseeing, contact the agency